Home >> Our Work >> Projects >> Stanari lignite power plant, Bosnia and Herzegovina

Stanari lignite power plant, Bosnia and Herzegovina


a

EFT’s 300 MW Stanari power plant, constructed by China's Dongfang, and financed by the China Development Bank, is located near Doboj in Bosnia and Herzegovina, in the Republika Srpska part of the country. Originally it was planned to be a 420 MW plant but this was considered to be on the edge of economic viability and the capacity was reduced to 300 MW.

The plant officially started commercial operations in September 2016, but was already out of date in terms of environmental standards. Its environmental permit stipulated compliance only with the older EU Large Combustion Plants Directive, not with the current Industrial Emissions Directive.

During the project's development a number of problems have been raised, including the following:

No environmental impact assessment for the changed project

The environmental impact assessment process was carried out only for the original, larger version of the project and the Republika Srpska authorities did not require a new process for the new, smaller plant.

While it may appear that a smaller plant has less environmental impact and therefore does not need a new study, in fact there were also several other changes which would change the plant's environmental impact:

  • Originally the project was planned to have a net thermal efficiency of 43 percent but the new version would have a net thermal efficiency of 34.1 per cent.
  • It was changed from supercritical pulverised lignite technology to subcritical Circulating Fluidised Bed Combustion.
  • The cooling technology has also been changed from a wet to a dry cooling system. This is one of the main reasons for the loss of thermal efficiency.

 


Al Jazeera's Dragan Stanimirović reports, the Stanari project is causing mixed reactions from local residents and concern to environmental groups about health impacts and CO2 emissions. (Not available in English)

 

Environmental permit not compliant with pollution standards

Since 2006, Bosnia and Herzegovina has been a member of the Energy Community, which requires all members to commit themselves to develop a common regulatory framework for energy markets and abide by certain EU legislation.

This meant that while developing the Stanari project, Bosnia and Herzegovina was obliged to adhere to the EU Large Combustion Plants Directive (LCPD), which regulates emissions limit values from new and existing combustion plants. Originally, the Republika Srpska authorities did not include the emissions limit values from the LCPD in Stanari’s environmental permit, but rather much laxer standards from domestic legislation with emissions 2-3 times higher.

In January 2014 an official complaint was submitted to the Energy Community secretariat by the Center for Environment from Banja Luka and in July 2015 it was announced that the Stanari environmental permit would be updated following changes in the Republika Srpska legislation.

Nevertheless, this still puts Stanari several years behind EU legislation, and it is highly likely that it will have to undergo additional investments to meet stricter emissions standards before the end of its lifetime.

Share:

Latest developments


 

Bankwatch in the media | September 20, 2016

* Chinese-built plant is first privately built in Western Balkans

* Plant increases regional dependent on dirty coal

* Chinese investment playing growing role in region's power

By Maja Zuvela

STANARI, Bosnia, Sept 20 The Balkan region's first privately-funded power plant came online on Tuesday, increasing the region's dependency on coal-fired power stations even as environmental concerns are driving them to the brink of the extinction elsewhere in Europe.

Blog entry | September 20, 2016

The Stanari lignite power plant in Bosnia officially starts operations today. If we are to have any hope of tackling climate change, it had better be the last one in the region.

Blog entry | May 27, 2016

Last year in the EU, 12.8 GW of wind power capacity was installed – more than any other electricity generation source. This means that wind can now generate 11.4% of the EU electricity consumption in a normal wind year, according to Wind Europe. At the same time Belgium and Scotland have shut down their last coal plants, signalling the golden days of coal are far behind them.

Balkans, coal
Press release | May 26, 2016

Western Balkan countries are planning investments in wind power, but these are being heavily outweighed by their investments in coal plants, according to a CEE Bankwatch Network analysis launched today. The region’s governments are actively planning 2800 MW of new coal plants but allowing only around 1166 MW of wind power plants to be built.

Publications

Study | June 14, 2017

The new reference document on Best Available Techniques for Large Combustion Plants (LCP BREF) and its implications for new coal.

Briefing | June 1, 2017

Bosnia and Herzegovina, Serbia, Montenegro and Romania all plan new lignite power plants during the next few years. In contrast, most EU countries are giving up building new coal plants and seven EU states are already coal-free. Since the European Investment Bank, the European Bank for Reconstruction and Development and the World Bank have virtually halted lending for new coal power plants, most of them are due to be financed by Chinese state banks – ExIm Bank and the China Development Bank.

Briefing | March 29, 2017

This briefing analyses ten coal-fired power plant projects across the Western Balkans and finds that, once the cost of carbon emissions allowances are factored in, they could become a serious liability for both the companies involved and the public.

Briefing | November 14, 2016

Coal is the single biggest contributor to global climate change. But governments and investors planning new coal capacities have a range of flimsy arguments why coal would be the best or the only alternative. This briefing busts a number of myths surrounding coal, such as "coal is cheap", "alleviates poverty" or "coal is clean".

Study | November 14, 2016

This report reveals how and why promises for new jobs in south-east Europe’s coal sector are exaggerated. Hardly any coal operations across the region are economically viable, and as a result many coal workers, especially in the mines, are set to lose their jobs, even if the plans for countless new power plants materialise. Governments, coal workers and their wider communities need to work together towards a just transition.