Home >> Our Work >> Projects >> Stanari lignite power plant, Bosnia and Herzegovina

Stanari lignite power plant, Bosnia and Herzegovina


a

EFT’s 300 MW Stanari power plant, constructed by China's Dongfang, and financed by the China Development Bank, is located near Doboj in Bosnia and Herzegovina, in the Republika Srpska part of the country. Originally it was planned to be a 420 MW plant but this was considered to be on the edge of economic viability and the capacity was reduced to 300 MW.

The plant officially started commercial operations in September 2016, but was already out of date in terms of environmental standards. Its environmental permit stipulated compliance only with the older EU Large Combustion Plants Directive, not with the current Industrial Emissions Directive.

During the project's development a number of problems have been raised, including the following:

No environmental impact assessment for the changed project

The environmental impact assessment process was carried out only for the original, larger version of the project and the Republika Srpska authorities did not require a new process for the new, smaller plant.

While it may appear that a smaller plant has less environmental impact and therefore does not need a new study, in fact there were also several other changes which would change the plant's environmental impact:

  • Originally the project was planned to have a net thermal efficiency of 43 percent but the new version would have a net thermal efficiency of 34.1 per cent.
  • It was changed from supercritical pulverised lignite technology to subcritical Circulating Fluidised Bed Combustion.
  • The cooling technology has also been changed from a wet to a dry cooling system. This is one of the main reasons for the loss of thermal efficiency.

 


Al Jazeera's Dragan Stanimirović reports, the Stanari project is causing mixed reactions from local residents and concern to environmental groups about health impacts and CO2 emissions. (Not available in English)

 

Environmental permit not compliant with pollution standards

Since 2006, Bosnia and Herzegovina has been a member of the Energy Community, which requires all members to commit themselves to develop a common regulatory framework for energy markets and abide by certain EU legislation.

This meant that while developing the Stanari project, Bosnia and Herzegovina was obliged to adhere to the EU Large Combustion Plants Directive (LCPD), which regulates emissions limit values from new and existing combustion plants. Originally, the Republika Srpska authorities did not include the emissions limit values from the LCPD in Stanari’s environmental permit, but rather much laxer standards from domestic legislation with emissions 2-3 times higher.

In January 2014 an official complaint was submitted to the Energy Community secretariat by the Center for Environment from Banja Luka and in July 2015 it was announced that the Stanari environmental permit would be updated following changes in the Republika Srpska legislation.

Nevertheless, this still puts Stanari several years behind EU legislation, and it is highly likely that it will have to undergo additional investments to meet stricter emissions standards before the end of its lifetime.

Share:

Latest developments


 

Press release | March 29, 2017

A new Bankwatch analysis examining ten coal-fired power plant projects across the Western Balkans finds that, once the cost of carbon emissions allowances are factored in, they could become a serious liability for both the companies involved and the public. Moreover, only a few feasibility assessments for coal power plants in the region are publicly available, and most of those have failed to properly take carbon costs into account, the briefing authors note.

Blog entry | November 14, 2016

Now is the time for southeast Europe to start an inclusive and just transition away from lignite, argues new Bankwatch research.

Press release | November 14, 2016

Promises for new jobs in south-east Europe’s coal sector are exaggerated, a new Bankwatch report reveals. Hardly any coal operations across the region are economically viable, and as a result many coal workers, especially in the mines, are set to lose their jobs, even if the plans for countless new power plants materialise. Governments, coal workers and their wider communities need to work together towards a just transition.

Press release | October 17, 2016

Sarajevo-based environmental watchdog Ekotim has submitted on Friday (October 14) an official complaint to the Energy Community dispute settlement mechanism (1) due to lax pollution limits for a new Chinese-backed 450 MW unit at the Tuzla coal power plant in Bosnia and Herzegovina.

Blog entry | September 27, 2016

China cuts coal at home but state owned companies and banks drive new coal expansion overseas, despite top level promises of green growth for developing countries, writes Beth Walker from China Dialogue.

Publications

Briefing | May 26, 2016

All the Western Balkans countries have committed to increase their share of renewable energy by 2020 to reach between 25 and 40 percent of their energy mix, as part of their obligations under the Energy Community Treaty. Yet this is far from obvious when examining their investment plans for new power generation capacity. Governments are actively planning to build 2800 MW of new coal plants with construction cost of at least EUR 4.5 billion. In contrast, these countries are only planning to build around 1166 MW of wind power plants, at an estimated cost of EUR 1.89 billion.

Bankwatch Mail | May 14, 2015

Western Balkan countries have ambitious plans to increase their electricity generation over the next years. But what will happen if they all become a regional energy hub? Will there be a demand for all the available electricity?

Study | March 19, 2015

Country chapters available for Albania, Bosnia and Herzegovina, Kosovo, Macedonia, Montenegro, Serbia.

For other languages, see here.

Analysing the estimated energy demand and production capacities in Western Balkan countries, this study shows that if countries realise their planned capacity expansions, the region will have a 56 per cent electricity surplus in 2024, led by Bosnia and Herzegovina and Serbia. Nearly all governments in the region aspire to become electricity exporters, but the study argues that if governments fail to take into account the regional perspective, they could end up with power plants becoming simply uneconomic to operate.