Stanari lignite power plant, Bosnia and Herzegovina


a

EFT’s 300 MW Stanari power plant, constructed by China's Dongfang, and financed by the China Development Bank, is located near Doboj in Bosnia and Herzegovina, in the Republika Srpska part of the country. Originally it was planned to be a 420 MW plant but this was considered to be on the edge of economic viability and the capacity was reduced to 300 MW.

The plant officially started commercial operations in September 2016, but was already out of date in terms of environmental standards. Its environmental permit stipulated compliance only with the older EU Large Combustion Plants Directive, not with the current Industrial Emissions Directive.

During the project's development a number of problems have been raised, including the following:

No environmental impact assessment for the changed project

The environmental impact assessment process was carried out only for the original, larger version of the project and the Republika Srpska authorities did not require a new process for the new, smaller plant.

While it may appear that a smaller plant has less environmental impact and therefore does not need a new study, in fact there were also several other changes which would change the plant's environmental impact:

  • Originally the project was planned to have a net thermal efficiency of 43 percent but the new version would have a net thermal efficiency of 34.1 per cent.
  • It was changed from supercritical pulverised lignite technology to subcritical Circulating Fluidised Bed Combustion.
  • The cooling technology has also been changed from a wet to a dry cooling system. This is one of the main reasons for the loss of thermal efficiency.

 


Al Jazeera's Dragan Stanimirović reports, the Stanari project is causing mixed reactions from local residents and concern to environmental groups about health impacts and CO2 emissions. (Not available in English)

 

Environmental permit not compliant with pollution standards

Since 2006, Bosnia and Herzegovina has been a member of the Energy Community, which requires all members to commit themselves to develop a common regulatory framework for energy markets and abide by certain EU legislation.

This meant that while developing the Stanari project, Bosnia and Herzegovina was obliged to adhere to the EU Large Combustion Plants Directive (LCPD), which regulates emissions limit values from new and existing combustion plants. Originally, the Republika Srpska authorities did not include the emissions limit values from the LCPD in Stanari’s environmental permit, but rather much laxer standards from domestic legislation with emissions 2-3 times higher.

In January 2014 an official complaint was submitted to the Energy Community secretariat by the Center for Environment from Banja Luka and in July 2015 it was announced that the Stanari environmental permit would be updated following changes in the Republika Srpska legislation.

Nevertheless, this still puts Stanari several years behind EU legislation, and it is highly likely that it will have to undergo additional investments to meet stricter emissions standards before the end of its lifetime.

Share:

Latest developments


 

Blog entry | March 16, 2016

While the Energy Community yesterday failed to consider more stringent air pollution rules for the Western Balkans, a new report quantifies the health costs of the region’s coal burning both within the region itself as well as in the neighbouring European Union.

Press release | October 16, 2015

Tirana, Albania - A group of CSOs from South East Europe (SEE) delivered over 16 000 petition signatures to Miguel Arias Cañete, EU Commissioner for Energy and Climate Action and Co-Chair of the Ministerial Council of the Energy Community today before its meeting in Tirana, Albania.

Blog entry | September 7, 2015

By now regular readers of the Bankwatch blog will know that the energy system in southeast Europe is corrupt, dirty and inefficient. But we now have an opportunity to change it.

Blog entry | March 23, 2015

Western Balkan countries have ambitious plans to increase their electricity generation over the next years. But what will happen if they all become a regional energy hub? Will there be a demand for all the available electricity?

Press release | March 19, 2015

The Western Balkans countries have strong electricity export ambitions that create the danger of stranded assets, finds a new report launched by CEE Bankwatch Network today. If governments take electricity expansion decisions without taking due account of developments in other countries, the region will have to compete with other nearby exporters and may find that its power plants become uneconomic.

Publications

Study | June 14, 2017

The new reference document on Best Available Techniques for Large Combustion Plants (LCP BREF) and its implications for new coal.

Briefing | June 1, 2017

Bosnia and Herzegovina, Serbia, Montenegro and Romania all plan new lignite power plants during the next few years. In contrast, most EU countries are giving up building new coal plants and seven EU states are already coal-free. Since the European Investment Bank, the European Bank for Reconstruction and Development and the World Bank have virtually halted lending for new coal power plants, most of them are due to be financed by Chinese state banks – ExIm Bank and the China Development Bank.

Briefing | March 29, 2017

This briefing analyses ten coal-fired power plant projects across the Western Balkans and finds that, once the cost of carbon emissions allowances are factored in, they could become a serious liability for both the companies involved and the public.

Briefing | November 14, 2016

Coal is the single biggest contributor to global climate change. But governments and investors planning new coal capacities have a range of flimsy arguments why coal would be the best or the only alternative. This briefing busts a number of myths surrounding coal, such as "coal is cheap", "alleviates poverty" or "coal is clean".

Study | November 14, 2016

This report reveals how and why promises for new jobs in south-east Europe’s coal sector are exaggerated. Hardly any coal operations across the region are economically viable, and as a result many coal workers, especially in the mines, are set to lose their jobs, even if the plans for countless new power plants materialise. Governments, coal workers and their wider communities need to work together towards a just transition.

Available languages: