While the European Union is trying to help Ukraine's political transition, Europe's financial support is cementing the country's dependence on an outdated and highly unsafe nuclear sector. To avoid further instability and political and environmental risks, European institutions need to offer better oversight and funding for alternative energy sources.

Browse updates


 

Quick facts
Ukraine's so-called 'nuclear safety upgrade programme' is necessary to keep Ukraine's ageing nuclear reactors working longer than they were designed to.

Costs: estimated with EUR 1.45 billion
Public financing: EUR 600 million (300m each from Euratom and EBRD), partially disbursed

Bankwatch calls on European institutions to re-direct their funding towards safer and sustainable energy solutions.

Read more in our briefing >> (pdf)

Meet the campaigners


Iryna Holovko, Campaign lead, Ukraine
Dana Marekova, Slovakia
Ana-Maria Seman, Romania
Akos Eger, Hungary

 

Key points

  • Design lifetime of 12 soviet-era nuclear reactors ends before 2020. Four lifetimes already prolonged, same is planned for the rest. more >>

  • The safety of Ukraine's reactors cannot be guaranteed: vicinity to armed conflict, accidents and safety issues. more >>


  • EUR 600 million from European institutions supports programme crucial for these plans. more >>

  • Government is stifling dissent, breaching international law. Potential implications for Ukraine’s transition and EU relations. more >>

  • Supply and disposal of nuclear fuel mean continued dependence on Russia more >>

 

 

Ukraine's nuclear timebomb


Ukraine has 15 soviet-era nuclear reactors built during Soviet times. 12 were designed to be shut down by 2020.

Kyiv is determined to keep all reactors running for at least ten years beyond their expiry date.

The lifetimes of four reactors have already been expanded without completing necessary safety upgrades, without properly assessing all risks and without considering sustainable alternatives.

Timeline of expiry dates of Ukraine's nuclear reactors
Lifetimes and design lifetimes of Ukraine's nuclear reactors. See larger image >>

Read more:
Europe's false solutions for Ukraine's energy woes
Blog post | March 9, 2016

 

Safety cannot be guaranteed


Europe's biggest nuclear power plant in Zaporizhia is located only 250 kilometres from the frontlines of the ongoing armed conflict in eastern Ukraine.

As the chief specialist for nuclear reactors at Zaporizhia confirms, nuclear power plants were not designed for war.

Read more:
Ukraine Nuclear Safety Upgrade Programme: loan conditions not met
Briefing | January 21, 2016


Video snippet: Sergei Shygyn, chief specialist for nuclear reactors at the Zaporizhia nuclear power plant

 

Between 2010 and 2015 alone, three different nuclear units were forced to shut down due to accidents. Severe safety issues were identified in two more units.

 

 

Europe's support for Ukraine's nuclear gamble


Rather than helping Ukraine to retire its nuclear fleet and chart a new, sustainable energy course, Europe is helping perpetuate an outdated and dangerous energy source.

Two European public lenders, Euratom and the European Bank for Reconstruction and Development, approved loans over EUR 300 million each for a so-called 'safety upgrade' project necessary to keep Ukraine's ageing nuclear reactors running.

For comparison, EUR 600 million is nearly a quarter of the total EU support (excluding Euratom) to Ukraine’s energy sector between 2007-2014.

What is worse, Ukraine unilaterally decided to postpone the safety upgrades. While safety is being delayed, the ageing reactors continue their operations.

Read more:
Ukraine snubs safety concerns and European donors, extends lifetime of fourth Soviet-era nuclear reactor
Press release | December 8, 2015

 


Teaser trailer for "No safe atom". Turn on subtitles in the settings on the bottom right.
Watch the full 11 minute film on YouTube >>

 

 

Stifled dissent, no public control


Despite the EU’s financial support, Ukraine’s government gets away with stifling dissent and breaching international law. This could have far reaching implications for Ukraine’s transition and its relations with EU countries and the EU.

 

The Aarhus Convention and the Espoo Convention stipulate that Ukraine must conduct public consultations with neighbouring countries and transboundary environmental impact assessments.

Ten things the Ukrainian government doesn't want you to know about its nuclear energy plans

Read our multimedia story

Breach of international law

In April 2013, the UN Espoo monitoring body ruled that Ukraine had breached the Espoo Convention when extending the licenses for two units at the Rivne nuclear power plant. The decision was taken without a transboundary environmental impact assessment (EIA) and without informing neighbouring countries about the plans, as Espoo procedures would require.

Read more:
Ukraine's Nukes Are in Breach of UN Convention
Press release | April 22, 2013

 

The governments of Slovakia, Romania, and Hungary have asked Ukraine for information on its nuclear power plans, requesting Ukraine to initiate public consultations in neighbouring countries. So far, Ukraine denies these requests (see responses to Slovakia and Hungary).

Also the European Commission stated in a letter (pdf) that Ukraine must adhere to the Aarhus and Espoo conventions. So far, however, it has taken no steps to make Ukraine's government comply.

Read more:
Letter to Marco Buti, Director General for Economic and Financial Affairs (pdf)
Policy letter | August 10, 2015

 

Stifling dissent

In 2015, Ukraine's state-owned nuclear operator Energoatom sued civil society organisation National Ecological Centre of Ukraine (NECU), alleging that NECU had published misleading information about safety standards at unit 2 of the South Ukraine nuclear power plant. Bankwatch's member group NECU was forced to post a retraction on its website.

Despite the case attracting international attention, the Ukrainian government appears keen to block public debate, both at home and abroad.

 

Dependence on Russia


Ukraine's dependence on Russian gas supplies is often used to defend the support for nuclear energy. But all of Ukraine's nuclear reactors use Russian technology and are almost entirely dependent on nuclear fuel from Russia.

Spent fuel is sent back to Russia, providing ample opportunity for Russia to put pressure on Ukraine, which has so far made no investments in infrastructure for the long-term, safe isolation of spent fuel and radioactive waste.

 

Share:

Latest developments


 

Blog entry | March 9, 2012

Ukraine plans to extend the lifetimes of its fifteen nuclear reactors, most of which will soon pass their expiration date. A new report shows how these plans that are pursued in utter silence have seen only an inadequate assessment.

Press release | March 8, 2012

Money from Euratom and the European Bank for Reconstruction and Development is to be used to finance the life time expansion of Ukrainian nuclear reactors, 12 of which had initially been scheduled to close down no later than 2020, according to an expert report published today by CEE Bankwatch Network.

Blog entry | September 13, 2011

Upgrades of hydro power plants in Ukraine are a prime example for greenwashing nuclear expansion with renewable energy. Alena Miskun from Bankwatch member group National Environmental Centre of Ukraine gives details on the thickening plot that European public banks are involved in.

Press release | July 22, 2011

The “Ukrainian NPP Safety Upgrade Package Program” currently under consideration for financing by the EBRD, will enable the lifespan expansion of old Soviet-time nuclear reactors, confirmed Gennady Sazonov, project and investment director of the production company Atomproektinzhynirynh, speaking during the first public consultations on the draft ecological assessment of the programme that was held in Kiev early this week.

Bankwatch in the media | July 5, 2011

Die EU finanziert Hochspannungsleitungen in der Ukraine – und verhindert dort den Ausstieg aus der Atomenergie. Auch gelangt so billiger Atomstrom aus der Ukraine in die EU.

Publications

Advocacy letter | May 10, 2017

In this joint letter, 18 members of the European Parliament, Nuclear Transparency Watch and CEE Bankwatch Network are asking the European Commission, as an opinion-making party of relevant international conventions, to provide leadership and express its clear support for the findings of relevant committees during the upcoming Meetings of Parties of Espoo Convention in June and of the Aarhus Convention in September, in favour of a coherent application of the Espoo and Aarhus Conventions to nuclear lifetime extensions.

Advocacy letter | December 1, 2016

Accompanied by a public action, Bankwatch and Global 2000 presented European Commission vice-president Maroš Šefčovič with this open letter. The letter points out the inconsistencies behind European public money supporting lifetime extension of soviet era nuclear reactors in Ukraine, which are made in violation of international environmental conventions and with insufficient implementation of safety requirements.

So far, the EU's support for Ukraine is a bad precedent for nuclear decision-making across Europe. It is time to set things straight!

Advocacy letter | August 1, 2016

Espoo bodies sent several specific recommendations concerning its non-compliance with the Espoo Convention to Ukraine. Nonetheless Ukraine seems to be either ignoring those or taking insufficient steps towards compliance. Therefore Bankwatch summarises the state-of-play in this letter and asks the Implementation Committee to consider a number of steps to ensure the Convention’s requirements are properly met by Ukraine.

Official document | June 16, 2016

Earlier in 2016, Bankwatch approached the European Commission's Directorate General for Economic and Financial Affairs, and made a request for documents related to the EUR 300 million Euratom loan for Ukraine's nuclear safety upgrade programme. Specifically, we asked for the evidence used by the Commission in making the first EUR 100 million disbursement from the loan.