Home >> Our Work >> Projects >> Kolubara lignite mine, Serbia

Kolubara lignite mine, Serbia

People living near the Kolubara mine have suffered for many years from pollution and geological impacts. The mine operator does not provide for a timely resettlement and fair compensation.

 


a

Quick facts

Planned investment: development of a new field in the lignite open pit mine in the Kolubara mining complex (located 60km south of Belgrade, spanning over 600 square kilometres)

Loans: European Bank for Reconstruction and Development (EBRD) - EUR 80 million; German development Bank KfW (EUR 65 million loan plus a grant of EUR 9 million).

Corruption: Several high ranking employees were under arrest in 2011. Allegations of corruption against the project promoter EPS are under official investigation.

Loan approved: The EBRD approved the loan without proper time to assess the loan's impacts on the local population and the Serbian energy sector.

The Serbian energy sector - dominated by lignite and the company EPS

The additional support for EPS by European public banks does not only strengthen its dominant position in the Serbian energy sector. It also directly contributes to the country's long-term reliance on lignite, one of the dirtiest and most climate damaging fossil fuels.

The state-owned energy provider Elektroprivreda Srbije (EPS), owner of the Kolubara mining complex (via its daughter company RB Kolubara), dominates the Serbian energy sector:

  • 69% of total electricity generation in Serbia is based on lignite (2010). 75% of the lignite production is coming from the Kolubara basin.
  • Power plants within the Kolubara/Obrenovac thermal and mining complex produce more than 50 percent of Serbian electricity.
  • The vertically integrated power company has a monopoly in lignite mining, electricity generation and distribution throughout the country.

The company becomes even more powerful through close personal connections between ruling political parties and the EPS management, allowing EPS to influence political decision on the Serbian energy sector to its own advantage. The Strategy for the development of the energy sector in Serbia until 2015 for instance clearly favours the interests of EPS and its coal business.

Future prospects for the energy sector

Lignite, mined in opencast pits, remains one of the main fuels for power generation within the long-term development plans of EPS.

According to official assessments the Kolubara basin has still 2.1 billion tonnes of lignite at disposal in its underground layers. Depending on the dynamics of exploration, Kolubara is expected to produce coal for another 50 years.


Power plants within the Kolubara complex already produce more than 50 percent of Serbian electricity.

More controversies around Kolubara

Corruption in Kolubara

In October 2011, 16 current and former members of the EPS management, including directors of the Kolubara mining complex, were arrested for embezzlement.

The case was already under investigation when the EBRD approved the Kolubara loan and Bankwatch made sure the EBRD was informed. But instead of waiting for the results of the police investigation, the EBRD chose to rush into the loan.

Resettlement of local communities

Local communities are not against coal exploration as such but they are fighting the expropriation of properties and are tired of the pollution from decades of coal development in the Kolubara complex.

Barosevac

Directly affected by the EBRD's project is the Barosevac community. The EBRD's project summary document (PSD) states:

Land acquisition and resettlement was substantially completed in 2008 in line with Serbian legal requirements.

That this isn't the case proved a Bankwatch fact-finding mission to Kolubara in summer 2011:

  • The Barosevac cemetery has not been removed - a precondition for opening the EBRD supported mining field C. None of the landowners have given their consent for the removal of graves.
  • 21 Barosevac households so far not included in the resettlement plans are located only 50 meters from the open pit mine. Despite the heavy impacts from the mining operations (for instance cracks in their homes), these households are not to be resettled and will not receive compensation.

 


Vreoci


An AlJazeera reportage on the issues surrounding resettlement near the Kolubara mines (local language only).

To further develop another mining field in Kolubara (field D), EPS tries to have 1180 households in the village of Vreoci resettled.

Villagers agreed with the Serbian government, that the village will be resettled collectively, but so far, no concrete plans have been established.

Instead, the Kolubara company offers insufficient compensation to households individually. Families are under pressure, live in unhealthy conditions and have been stigmatised in the Serbian media.

In summer 2011, authorities began to excavate bodies from the village's cemetery, ignoring objections by inhabitants and the fact that no agreement had been reached.

The EBRD points out that their loan is not connected to field D. The bank therefore does not feel responsible to ensure a fair resettlement in Vreoci.

But the director of fields C and D has stated in an interview with our campaigner that those fields are technologically and geologically interconnected and that their conceptual separation would be artificial.

 


Is there a way forward?

More detailed recommendations are in our briefing (pdf):
EBRD support for Kolubara paving the “ash way” for development of Serbia

The only proper solution to the range of problems with Kolubara would be not to finance the project at all. Instead, the EBRD could identify investments that counter the dominance of lignite in the Serbian energy sector and that help to increase the share of renewable energy in the country (currently only about 1%, excluding large hydro installations).

In case of the Kolubara investment, the least we ask of the EBRD is to make sure EPS respects the agreement with local communities, prepares a detailed plan for the collective resettlement of Vreoci and offers adequate compensation for families in Barosevac.


For more information, contact Zvezdan Kalmar, the Bankwatcher from Center for Ecology and Sustainable Development (CEKOR), Serbia, monitoring the project's development.

Share:

Latest developments


 

Blog entry | May 13, 2013

People from the Kolubara mine basin in Serbia have many stories to tell about the hardships they face due to the lignite mining operations. Serbian Bankwatcher Nikola Perusic adds his account to two stories in the guardian and in Bankwatch Mail 56.

Press release | May 10, 2013

Istanbul – With the 2013 EBRD annual meetings underway and in spite of repeated commitments to sustainability, the bank is set to continue financing coal projects that will dangerously aggravate climate change.

Bankwatch in the media | April 25, 2013

Development bank continues to fund coal projects as Serbia proves another frontline in battle between energy and environment

Blog entry | April 16, 2013

By investing in Serbian lignite, the European Bank for Reconstruction and Development cements the rigid structure of the country’s electricity market. Investing in energy efficiency instead could help reduce energy bills and free up further renewables funding.

Blog entry | January 30, 2013

Those were the words of Serbian Energy Minister Zorana Mihajlović, speaking last week in a press conference during which she announced that a thorough investigation is ongoing into corrupt practices by the management of the Kolubara mining complex.

Publications

Advocacy letter | April 10, 2012

In its letter, the independent union at the Kolubara mine points at extremely difficult and inhumane working conditions and their employer's reckless attitude toward employees. The union calls on the EBRD to not extend a loan to the Kolubara lignite mine before workers' rights are being respected.

Advocacy letter | March 30, 2012

In its letter to the European Bank for Reconstruction and Development Bankwatch member group CEKOR discusses issues related to the Kolubara lignite mining project that have not yet been clarified. Among them is the fact that the EBRD's loan is indeed connected to the resettlement of the Vreoci community, something which the EBRD has denied so far, and the so far vague claim that the project will contribute to emission reductions and environmental improvements.

Advocacy letter | March 13, 2012

The Vreoci community from the Kolubara mining basin requests from the EBRD to suspend the loan arrangements for the Kolubara lignite mine due to the constant and increasing violations of human and property rights by the Public Company Mining Basin "Kolubara" - Lazarevac.

Briefing | November 21, 2011

Linked to a slew of controversies, the Kolubara lignite mining project in Serbia is in line for support from European public banks. Corruption allegations, pollution at local level, irregularities in resettlement of local populations and not to forget a climate damaging approach to energy investments should be reason enough to find alternative options.

An updated version of this briefing is available here (May 12, 2012).

Briefing | October 3, 2011

Despite numerous international calls for the discontinuation of public support for fossil fuels in the face of climate change, the EBRD continues to finance the dirtiest among them, coal. What is more, the bank plans to expand its activities in this field. CEE Bankwatch Network urges the EBRD to phase out any support for coal industry making it more competitive and disadvantaging sustainable energy.