No less than 15 firms contracted to build the Trans Adriatic Pipeline (TAP) and the Trans Anatolian Pipeline (TANAP), the two main sections of the so-called Southern Gas Corridor, have been implicated in various forms of corruption in the past, according to a CEE Bankwatch Network report published today.